I. Measurement of the Incinerator 4,410 W x 3,037 L x 4,836 H mm
II. Energy
Utility issue for the incineration gadgets running is the sticking to.
1) Gas: Light oil or Kerosene
2) Electrical Power
Electric Motor
-0.1– – 110kW: Air Conditioner 220V x 3PH x 50Hz
– – – – Below 0.1 kW: Air Conditioner 220V x 1PH x 50Hz Control Circuit
– – – – MCC control: A/C 220V x 1PH x 50Hz
– – – – Tool: Air Conditioner 220V x 1PH x 50Hz
– – – – Switch over Over Gear: Air Conditioning 220V x 1PH x 50Hz
2.
– – Switch Over Gear: Air Conditioning 220V x 1PH x 50Hz
2. Door -to-door transportation, Setup, Commissioning and Training
3. Prices quotation
– – Cost requires to be given in Ethiopian Birr (incl. VAT)
– – Cost need to include extra cost elements such as products, insurance, installment and training for essential personnel, until approval obligation where suitable